Daily Archives: November 13, 2012

BC Rainways Project Summary (FINAL DRAFT)

Our group has divided our project into several main aspects. The first aspect involves the installation of two drainage pipes on the eastern-most side of Whitehead Hall that will lead rainwater down into a series of rainwater storage barrels. The … Continue reading Continue reading

Posted in Project Updates | Comments Off on BC Rainways Project Summary (FINAL DRAFT)