BC Rainways Project Summary (FINAL DRAFT)

Our group has divided our project into several main aspects. The first aspect involves the installation of two drainage pipes on the eastern-most side of Whitehead Hall that will lead rainwater down into a series of rainwater storage barrels. The … Continue reading Continue reading

Posted in Project Updates | Comments Off on BC Rainways Project Summary (FINAL DRAFT)

Sidewalk Part of the Project

The sidewalks that are filled with cement and soil, are useless. The sidewalks are so wide, and no one even walk on that space because there are small trees. Along Campus Road from Whitehead hall to James hall the boxes … Continue reading Continue reading

Posted in Project Updates | Comments Off on Sidewalk Part of the Project

Improved Draft Design and Final Project Outline Document

This post is about the new, final changes to our project design draft/idea. We worked with our idea over the past week, and with the help and advice of Professor Cheng have come to a final outline. *** Download our … Continue reading Continue reading

Posted in Project Updates | Comments Off on Improved Draft Design and Final Project Outline Document